A client with three premises does not need three proposals. Attach each priced line to the premises it covers, and the document becomes a multi-site proposal: a card for each site, a site label on every line, subtotals per site, and a year-at-a-glance schedule attributed by site — all inside one document, signed once.
Why this beats one proposal per site
Because it matches how the client thinks about the relationship. A regional manager approving cleaning for three stores wants one number and one signature, not three parallel threads to chase and reconcile. Splitting the account across documents also splits the acceptance: two sites live, one still pending, and no single place that says what was agreed.
What happens when they accept?
Each line stands up its own recurring service at its own site, carrying that line's price, cadence and contractor method notes. One acceptance activates the whole account — three sites scheduled, each with the right instructions attached to the right premises.
The one exception is a proposal that asks the client to choose one option (for example monthly, quarterly or six-monthly). There, only the option the client ticks — plus the lines included with every option — becomes service lines; the options they did not choose are kept on the proposal for the record and never schedule anything. See how to offer options on a proposal.
This is why it is worth putting the method notes on the proposal lines rather than adding them later. They are copied onto the service line at acceptance, which means they reach the contractor's work order without anyone re-typing site knowledge.
Does the proposal itself still need a site?
Yes — give the proposal a site of its own as well as the per-line premises. A line with no premises of its own falls back to the proposal's site, so setting that site re-points only those lines and never touches a line that already names its premises.
The proposal's site matters most at signing. A proposal accepted with no site of its own stands up no service lines at all, even if every line names a premises. The signing still succeeds for the client, so the platform says what was skipped instead of staying quiet: record_proposal_acceptance reports skipped_reason: "missing_site" and leads its next steps with update_proposal.
This happens most often with a quote raised from a portal service request for an address you had no site for. Create the site, then attach it to the draft with update_proposal and its site_id before you send. The site must belong to the proposal's own client, and clearing it to nothing is refused.
Can the sites differ from each other?
Substantially. Each line is independent, so across one document you can have:
- different prices per site, reflecting size or travel;
- different cadences — one site quarterly, another monthly, another on a specific pair of months;
- different scope — an extra pane of glass at one site, an exclusion at another, expressed in that line's own description, inclusions and exclusions.
The only thing they share is the client, the covering note, and the signature.
How should I handle travel and other shared costs?
Two defensible options, and the billing model should decide it:
- Fold it into the site's price and disclose it in the line's inclusions text ("travel and accommodation are included in the price"). Choose this when you raise one invoice per job, because a single price per site then maps one-to-one onto that visit's invoice with nothing to reconcile.
- Itemise it as its own line attached to the same site. Choose this when the client's own purchase order is structured that way and their accounts team matches line by line.
Deciding this from the invoice backwards, rather than from the quote forwards, is the thing that saves you work later.
A proposal can cover only part of a year
There is no requirement to project twelve months. Where a client is mid-renegotiation and can only commit to the next two visits, price exactly those two visits and say so. Restricting a line's cadence to specific months gives an honest visits-per-year figure and an honest total — the schedule shows two marked months rather than a smeared annual estimate — and you re-propose when the new schedule lands.